
Superheaters Coils are the most critical Boiler Component of the
modern day Thermal Power Plant and are subject to very high metal
temperatures. In fact the capacity of the Superheater to work
without failure at higher Temperatures is what determines the
boilers Capacity and it effects improvement in economy by reducing
Steam Consumption of the Steam Turbine.
We have fabricated thousands of Superheaters - Radiant, Pendant,
Final, Fluidized Bed types, Reheaters for all kinds of Boilers
having Complicated very close and Compact Shapes with tube sizes
ranging from 32mm OD to 76.2mm OD and thickness from 3mm of 12mm in
all types of Boiler Quality Steel Grades ranging from Carbon to
Alloys and Stainless Steel for metal temperature ranging up 650 C
and for Boilers of 10 to 500 MW Capacity.
Specifications
Description | Superheater |
Material | Alloy steel, Carbon steel etc. |
Material standard | ASTM, EN or ISO etc. |
Structure Type | Tube Coil |
Dimension | Customization |
Supply ability | 500 ton per month |
Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly→Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging |
Thermal Efficiency | Around 95% |
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube.
Name&Type | Supply Ability | FOB Price |
Boiler drum | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler header | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler waterwall panel | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler economizer | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler super heater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Boiler air preheater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Other | 300Ton/Tons per Month | Contact Me Get Latest Price |
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).
Contact Information
ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.orlpower.com
Suzhou orl power engineering co ., ltd
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).
Product Description
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube
Packaging & Shipping
We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.
Company Business
Our products have been wildly used in power plants and large international companies overseas.
Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.
FAQ
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the
technical details.
Contact Information
ADD: Zhangjiagang City, Jiangsu, China
E-mail: orl@orlpower.com
Website: www.boiler-units.com