Home /

Self Climbing Formwork System Versatile Backets For High Rise Buildings

Send your message to this supplier
*From:
Your email address is incorrect!
To:HORIZON FORMWORK CO., LTD.
*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Yes!I would like your verified suppliers matching service!
Buy cheap Self Climbing Formwork System Versatile Backets For High Rise Buildings from wholesalers
  • Buy cheap Self Climbing Formwork System Versatile Backets For High Rise Buildings from wholesalers
  • Buy cheap Self Climbing Formwork System Versatile Backets For High Rise Buildings from wholesalers
  • Buy cheap Self Climbing Formwork System Versatile Backets For High Rise Buildings from wholesalers

Self Climbing Formwork System Versatile Backets For High Rise Buildings

Ask Latest Price
Brand Name:HORIZON
Model Number:Climbing scaffold
Price:pls ask HORIZON
Payment Terms:L/C, T/T
Supply Ability:100 tons per week
Delivery Time:20-25 days
Company Data
Site Member
Contact Person H. Chang
Business Type: Manufacturer Exporter
Officials: HUSTPARK BUILDING NO. 4, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Quality: Quality Certifitation Available
Product Details Company Profile
Product Details

Versatile Backets for All Types of Climbing Applications in High-rise Buildings


Climbing Formwork CB240 is a crane-dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

• The sets made up of brackets and formwork panels are moved to the next pouring step with one single crane lift.

• Adaptable to any structures, including straight, inclined and circular walls.

• It is possible to build working platforms at different levels. The access to the platforms is provided by safety ladders.

• All brackets include all the connectors to fix handrails, push-pull props and other accessories.

• The climbing brackets allow rolling-back the formwork panels using a system, formed by a carriage and a rack, incorporated in these brackets.

• Formwork’s vertical adjusting and plumbing is completed with leveling screw jacks and push-pull props.

• Brackets are anchored to the wall with anchor cone system.


1. Climbing bracket


2. Main platform


3. Pouring platform


4. Finishing platform


5. Roll-back system


6. Push-pull prop


7. Vertical waling


8. Anchor system


9. Formwork

Climbing sequence:


Step 1

The first pouring is to be completed by using the proper wall elements and has to be exactly aligned with adjusting struts.


Step 2

The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.

Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.


Step 3

After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.


Step 4

Release and remove bolts that fixing the positioning anchor point.

Loosen and remove tie-rod

Loosen the wedges of the carriage unit.


Step 5

Retract the carriage and lock it with wedge.

Install upper climbing cones

Loosen wind securing device, if any

Remove the lower climbing cone


Step 6

Adjust the carriage into the common center of gravity and lock it again.

Attach the crane sling to the vertical waling.

Remove the security bolts of the bracket.

Lift the climbing bracket by crane and attach it to the next prepared climbing cone.

Insert and lock the security bolts again.

Install the wind-load device, if required.


Step 7

Move the carriage back and lock it by wedge.

Clean the formwork.

Install reinforcement bars.



Step 8

Move the formwork forward until lower end rests against top of the finished section of the wall.

Adjust formwork vertically by means of push-pull brace.

Fix tie-rods for the wall formwork


Company Profile

HORIZON FORMWORK CO., LTD.

       As a professional formwork company, HORIZON Formwork Co., Ltd. contributes its effort to the design, manufacturing and marketing of formwork systems, scaffolding systems and all kinds of accessories, which are widely used in commercial, residential and infrastructural projects. We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
  The main products we offer : wall formwork, slab table formwork, scaffolding system, timber beam H20, steel props, formwork wing nuts, tie rods, formwork clamps, and other formwork accessories, scaffolding fittings etc..

Over years of developement, we have completed many projects both in domestic market and abroad. Thanks to the reliable products quality and thoughtful service, HORIZON has won good reputation from the clients.

  HORIZON Formwork, your reliable formwork partner!

Send your message to this supplier
*From:
Your email address is incorrect!
*To:

HORIZON FORMWORK CO., LTD.

*Subject:
Your subject must be between 10-255 characters!
*Message:
Your message must be between 20-3,000 characters!
Characters Remaining : (0/3000)

You May Like

China Modular Self Climbing Platform Scaffold CB240 High Load Bearing Supporting Frame wholesale

Modular Self Climbing Platform Scaffold CB240 High Load Bearing Supporting Frame

China Telescopic Shaft Beam for Internal Climbing Wall Formwork in Stairwell wholesale

Telescopic Shaft Beam for Internal Climbing Wall Formwork in Stairwell

China Crane Lifted Jump Form Formwork 70cm Working Platform Width For Core Wall wholesale

Crane Lifted Jump Form Formwork 70cm Working Platform Width For Core Wall

China Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted wholesale

Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted

China H20 Beam Climbing Formwork System Vertical Waling For Concreting Core Wall Structures wholesale

H20 Beam Climbing Formwork System Vertical Waling For Concreting Core Wall Structures

China Multipurpose Automatic Climbing System Bracket Vertical Formwork Easy Operation wholesale

Multipurpose Automatic Climbing System Bracket Vertical Formwork Easy Operation

China Flexible Climbing Formwork System Shaft Platform 1.45-3.9m Telescopic Length wholesale

Flexible Climbing Formwork System Shaft Platform 1.45-3.9m Telescopic Length

China Push Pull Brace Climbing Scaffolding System Tailored Beams To Support Wall Form wholesale

Push Pull Brace Climbing Scaffolding System Tailored Beams To Support Wall Form

China Internal Platform Climbing Formwork System Telescopic Length Shaft With Gravity Pawl wholesale

Internal Platform Climbing Formwork System Telescopic Length Shaft With Gravity Pawl

China H20 Beam Automatic Climbing Formwork 5.40m Working Height Movable Horizontally wholesale

H20 Beam Automatic Climbing Formwork 5.40m Working Height Movable Horizontally

China Crane Lifted Climbing Formwork System , Jump Formwork System Platform Width 70cm wholesale

Crane Lifted Climbing Formwork System , Jump Formwork System Platform Width 70cm

Inquiry Cart 0